The Park Center Treptow is a mixed-use retail, office and residential development with an area of approximately 27,000 m².

The overall project includes the IP-typical triad of PV and CHP plants, as well as EV charging stations:

The installed rooftop PV system has a capacity of 197 kWp.

The CHP sub-project included the renewal of the rooftop heating system. Two Capstone micro gas turbines with a nominal capacity of 100 kWe were installed, with preparation for another two Capstone systems; in addition, a modern natural gas boiler cascade with 1.8 MW firing capacity replaced the former old oil boiler.

The triad will see 10 EV charging stations with a load management system, scheduled to be operational in 2022.